Quick answer: A strata repainting briefing pack gives the committee or AGM the painting information owners need to decide in one meeting. It usually covers six parts: a condition summary with photos, the proposed areas and scope, and comparable quotes. Then come budget points and open questions, timing and access, and the decisions required. That is the structure Premier Painting Company sees work best after 28+ years of strata repaints across Sydney, the Central Coast and Wollongong.

Many strata repainting decisions stall for the same reason. Owners arrive at the meeting with a few quotes, some photos and different ideas about what needs doing, so the vote is pushed to the next meeting. Each delay leaves weathered paint and cracked render exposed for another season. A short briefing pack solves most of this. This guide sets out what to include, based on what we see help strata committees reach a decision.

What should a strata repainting briefing pack include?

Strata committee reviewing a repainting briefing pack with building photos and colour samples

A good briefing pack answers the questions owners will ask before they vote, in the order they tend to ask them. It does not need to be long. The packs we see work best run to a few pages, with the photos and quotes attached.

PartWhat it answers for ownersWhere the information usually comes from
1. Condition summary and photographsWhat is wrong with the paintwork now, and how serious is it?Site assessment and the painting contractor’s quote photos
2. Proposed areas and scopeWhich areas are being painted, and what work is involved?Scope of works or the contractor’s itemised quote
3. Comparable quotationsHow do the quotes differ, beyond the price?Each contractor’s written quote
4. Budget and unresolved questionsWhat will it cost, and what is still unknown?Quotes, provisional items and the strata manager
5. Timing, access and dependenciesWhen can the work happen, and what has to happen first?The contractor’s proposed program
6. Decisions required and next stepsWhat exactly are owners being asked to approve?The committee or strata manager

The sections below cover each part from a painting contractor’s point of view. Your strata manager will confirm how the decision is put to owners and what approval your scheme needs.

Condition summary and photographs

Start with what owners can see for themselves. A short condition summary describes the state of the paintwork in plain words, area by area, and the photos back it up. Owners who live on the other side of the building may never have seen the peeling balcony edge or the rust stains under a window.

For each area, a useful summary notes the defect, where it is and whether it is getting worse. Common painting defects on strata buildings include:

  • Peeling, flaking or blistering paint.
  • Chalky paint that rubs off on your hand.
  • Cracked or drummy render, which sounds hollow when tapped.
  • Rust stains from balcony rails, fixings or steel inside concrete.
  • Failed sealant around windows and joints.
  • Water stains or mould on soffits and ceilings.

Photos do most of the work here. When we prepare a detailed quote, our Project Manager includes photos of each area to be painted, along with spots that may need render repairs or other preparation. Those photos can go straight into the pack, so owners see the same evidence the quote is based on. Our article on when a strata repaint should include render repairs explains why those spots matter.

Project manager photographing peeling paint and cracked render for a strata condition summary

A clear condition record also supports good maintenance planning. NSW Fair Trading reminds owners corporations that common property must be kept in good repair, and that delayed repairs tend to cost more.

Proposed areas and scope

This part tells owners what they are being asked to pay for. It should be a plain-English summary, not the full technical specification. Most owners only need the main points to make a decision.

  • The areas included, such as each elevation, balconies, common area interiors, fences or the car park.
  • Any areas left out or deferred to a later stage.
  • Surface preparation in broad terms, such as washing, scraping, render repairs and priming.
  • The paint system and number of coats for the main surfaces.
  • The access method for each area, such as scaffold, an elevated work platform or rope access.

Keep the detailed specification as an attachment for anyone who wants to read it. Our guide to a scope of works for a strata painting tender covers how that document is written.

Pro tip: Include a marked-up photo or simple plan of the building showing which areas are in scope. Owners understand it in seconds, and it heads off the “is my balcony included?” questions on the night.

Once a quote is accepted, Premier Painting’s colour consultancy service is available on request for most projects, previewing colour options on photos of your building before owners finalise the scheme.

Comparable quotations and the differences that matter

Owners naturally look at the bottom line first. The pack helps most when it shows why the prices differ. Two quotes can sit thousands of dollars apart simply because one includes render repairs and the other lists them as an extra.

Setting the quotes out side by side, item by item, makes those differences easy to see.

Item to compareWhat to look for in each quote
Areas includedThe same elevations, balconies and common areas in every quote
Surface preparationWashing, scraping, crack filling, render repairs and priming
Paint systemProduct type and number of coats for each surface
Access methodScaffold, elevated work platform or rope access, and whether access hire is included
Provisional items and exclusionsAllowances for items such as render repairs or lead testing, and anything left out
WarrantyLength of the workmanship warranty and any manufacturer warranty
ProgramProposed duration and how the work is staged

Two strata painting quotes laid side by side for comparison before a committee meeting

Where a quote is unclear, note the question in the pack rather than guessing the answer. Our article on questions to ask before approving a strata painting quote covers what to clarify with each contractor.

Common mistake: Presenting the quotes as a single line of prices. Owners then vote on the lowest number, even when that quote leaves out preparation the building clearly needs.

Budget considerations and unresolved questions

This part shows the full cost picture, including what is not yet known. It is better for owners to hear about open items before the vote than to meet them later as variations, which are changes to the agreed price.

From the painting side, the budget points that usually matter are:

  • Full repaint or staged work. A repaint can be staged by elevation, building or year when funds are tight.
  • Provisional items. Render repairs, timber replacement and lead testing on older buildings are often priced as allowances, because the full extent is only clear once preparation starts.
  • Optional extras. A colour change, extra coats or an anti-graffiti coating at ground level can be priced as separate options.

List any open questions plainly, such as how much render repair will be needed once access is set up. Your strata manager can show how the painting cost fits into the capital works fund. Our guide on how often strata buildings should be repainted can also help owners plan for the next cycle.

Timing, access and dependencies

Owners want to know when the work will start, how long it will take and how it will affect them. A short timing section answers all three. Most of this comes from the painting contractor’s proposed program.

  • Start window. Mild seasons usually suit exterior painting, with weather days allowed for in the program.
  • Duration. An estimate for the whole job and for each stage or elevation.
  • Resident impact. Balcony access, notice periods, windows kept closed during spraying and car park areas that need clearing.
  • Work that comes first. Render repairs and any waterproof membrane coatings need to be done before the finish coats go on.

If other trades are booked on the building, note them so the painting program can work around them. Our article on timing strata painting to avoid disruption covers the scheduling side in more detail.

Decisions required and next steps

End the pack with a short list of the painting decisions the meeting needs to make. Clear, separate decisions are easier to vote on than an open discussion. On most strata repaints, the list looks like this:

  1. Which scope option to go ahead with, such as a full repaint, staged work or selected areas.
  2. Which painting contractor to engage.
  3. The colour scheme, or how and when it will be chosen.
  4. The preferred start window.

Your strata manager will confirm how these are put to owners and what approval your scheme needs. Once the repaint is approved, the painting contractor confirms the program, issues resident notices and arranges access. At Premier Painting, a dedicated Project Manager and Supervisor then run the job from start to finish.

TL;DR: Strata Repainting Briefing Pack at a Glance

  • A strata repainting briefing pack gives owners the painting information they need to decide in one meeting.
  • The six parts are condition and photos, scope, comparable quotes, budget and open questions, timing, and decisions required.
  • Photos from the contractor’s quote show owners the same evidence the price is based on.
  • Compare quotes item by item, not just on price, and list provisional items openly.
  • End with a short list of clear painting decisions for the meeting to vote on.
  • Next step: contact Premier Painting for a free quote → 1300 916 291 or request a painting quote online

Get a Detailed Quote for Your Briefing Pack

Preparing a pack for your next meeting? Premier Painting can assess your building and provide an itemised quote with photos of each area, ready to include in your committee or AGM pack. Call us on 1300 916 291 or request a free quotation online.

Frequently Asked Questions

What should be included in a strata painting proposal for an AGM?

A strata painting proposal for an AGM works best with six parts. These are a condition summary with photos, the proposed areas and scope, comparable quotes, budget points and open questions, timing and access, and the decisions required. Keep it to a few pages plus attachments, so owners can read it beforehand and come ready to vote on the strata repainting work.

What photos should go in a strata painting condition summary?

Include clear, dated photos of each area to be painted, plus close-ups of defects such as peeling paint, cracked render, rust stains and failed sealant. Wide shots help owners see where each problem sits on the building. Premier Painting’s detailed quotes include photos of the areas to be painted and spots that may need render repairs, ready to go into the pack.

Should the colour scheme be approved at the same meeting as the repaint?

It can be, and it often saves a second meeting. If owners approve the scope and contractor but leave colours open, the start date can slip while the colour scheme is debated. Including two or three options, ideally shown on photos of your building, lets the meeting decide both together. Otherwise, agree how and when colours will be chosen.

How far ahead should a briefing pack be ready before the meeting?

Aim to have the pack ready when the meeting notice goes out, so owners can read it beforehand. Allow time before that for a site assessment and written quotes, which usually means starting several weeks ahead. Your strata manager can confirm the notice timing for your scheme and when papers need to be with them.

Can the painting contractor help prepare the briefing pack?

Yes. A painting contractor can supply much of the content: photos of each area, an itemised quote, the access method and a proposed program. The committee or strata manager then puts the pack together and compares the quotes. Premier Painting’s detailed quotes include photos as standard, so the information drops straight into a strata repainting pack.

Related Resources

About Premier Painting Company: Premier Painting has delivered strata, commercial and residential painting across Sydney, the Central Coast and Wollongong for 28+ years. We are a Strata Services Specialist Company, Dulux Accredited Painters and a member of Master Painters Australia, with CM3-accredited safety systems. Every strata project has a dedicated Project Manager and Supervisor and carries a 7-year workmanship warranty. Contact us on 1300 916 291 or visit premierpainting.com.au.